Visit History
| 10/18/2025 | No Change Data Mailer Returned | |
| 3/3/2025 | Measur+1Visit | |
| 3/9/2011 | Assessor Reviewed | FINAL |
| 9/10/2010 | Foundation | CHECKED SETBACKS, DRAINAGE, SILL PLATE CONNECTORS, DAMP PROOFING, ALL GOOD |
| 7/9/2009 | Changed Lot Size | CHANGED LOT SIZE PER SUBDIVISION FINAL PLAN SECOND REVISION DTD 2-3-2009 APPROVED BY THE PLANNING BOARD. THIS PLAN WAS RECORDED IN YCRD ON 2-26-2009. THIS LOT WAS SPLIT TO CREATE LOT 109-1. |
| 11/19/2008 | Changed Lot Size | PER SUB DIV |