Visit History
| 10/17/2025 | No Change Data Mailer Returned | |
| 3/13/2025 | Total Refusal | |
| 10/6/2016 | FINAL | BATHROOM |
| 8/12/2016 | Framing | 2ND FLOOR BATH |
| 8/12/2016 | PLUMBING ROUGH IN | 2ND FLOOR BATH |
| 8/10/2016 | Elec Rough In | 2ND FLOOR BATH |
| 7/23/2014 | FINAL | SACO BAY CREAMERY / BARN |
| 7/15/2014 | PLUMBING ROUGH IN | BARN |
| 5/23/2012 | Listed | 2ND FLR OF BARN IS A FULL APTMT W/SM (1/4) FINISHED LOFT. FLOORING = LG PINE BOARDS; KIT/LRM COMBO, BEDRM, FULL BATH W/STANDUP SHOWER. CHG'D 2 STORY BARN TO GAR W/APT - ADDED BATH TO CONSTR DETAIL - NOW 5. |
| 6/13/2008 | Listed NOH | |
| 9/25/2002 | Listed | |