Visit History
| 12/19/2024 | Measur+1Visit | |
| 4/9/2016 | Listed | CHG'D TO AVG CONDITION. TENANT FITUP 1,500 SF. |
| 6/2/2015 | Framing | 1ST FLOOR |
| 6/20/2014 | Listed | INTERIOR RENOV - NVC |
| 9/5/2013 | Elec Rough In | |
| 9/5/2013 | Framing | |
| 6/6/2007 | Elec Rough In | MIDDLE UNIT FIRST FLOOR |
| 6/5/2007 | Plumbing | IN-WALL PLUMBING INSPECTION ON MIDDLE FIRST FLOOR UNIT. ADVISED TO INSTALL ACCESS PANELS IN 2 LOCATIONS IN ADA CHANGING ROOM |
| 5/17/2007 | Measur+Listed | MEASURED ADDN - PER TENANT 2 BATHS 2ND & 3RD FLOOR - OFFICE 1ST FLOOR |
| 2/8/2007 | Framing | TENANT FIT-UP ON STOREFRONT EXTREME RIGHT SIDE |
| 2/7/2007 | Elec Rough In | |
| 8/23/2006 | Elec Rough In | 2ND FLOOR ROUGH-IN |
| 8/21/2006 | Framing | INSPECTED METAL FRAMING FOR GYPSUM CEILING AT THRID FLOOR. SOME KNOB AND TUBE WIRING STILL NEEDS TO BE REMOVED AND SPECIFICATIONS NEED TO BE FURNISHED BY ENGINEER. CONTRACTOR STATED THAT PLANS WILL BE BROUGHT IN 8/22/06. |
| 8/15/2006 | Elec Rough In | REVIEWED HAZARDS ON 2ND FLOOR ROUGH AREA |
| 8/14/2006 | Elec Rough In | |
| 7/13/2006 | Plumbing | REAR BATHROMS/ALL THREE FLOORS |
| 7/11/2006 | Elec Rough In | 2 & 3 FLOOR BATHROOMS |
| 7/11/2006 | Framing | REAR ADDITION/BATHROOMS |
| 6/15/2006 | Elec Rough In | |
| 6/2/2006 | Elec Rough In | 3RD FLOOR WALLS |
| 6/1/2006 | Framing | 3RD FLOOR ONLY |
| 5/17/2006 | Plumbing | SUB SLAB |
| 4/25/2006 | Elec Rough In | CHG'D TO AVG CONDITION. TENANT FITUP 1,500 SF. NEW WINDOWS. |