Visit History
| 3/7/2025 | Measur+1Visit | |
| 8/5/2020 | Card Prepped | TAKEN OUT OF UC. |
| 7/28/2020 | FINAL | |
| 7/27/2020 | Electric Finish | |
| 4/27/2020 | Elec Rough In | |
| 4/27/2020 | PLUMBING ROUGH IN | |
| 4/27/2020 | Framing | |
| 4/1/2020 | Measur+Listed | |
| 3/20/2020 | Changed Lot Size | COMBINED 2 LOTS_031-197-000-000 AND 031_199_000_000. LOT MERGER CERTIFICATE IS IN AD |
| 3/3/2020 | Inspection Assessing | |
| 3/3/2020 | Measur+Listed | BUILT UP. UC. |
| 2/26/2020 | Assessor Reviewed | HOUSE DEMO'D_NEW CONSTRUCTION UNDERWAY_ NEED TO BUILD UP CARD |
| 12/11/2019 | Foundation | |
| 10/8/2019 | Final Miscellaneous | Pre-demo inspection |
| 5/24/2012 | Measur+Listed | 6% FOR RAILROAD |
| 3/21/2009 | Listed NOH | DEMO NO START |
| 5/19/2007 | Listed NOH | SAME COND |
| 9/2/2003 | Change Reinspection Rereview | |
| 7/25/2003 | Listed NOH | |
| 9/26/2002 | Listed NOH | |