Visit History
| 2/28/2025 | Assessor Reviewed | |
| 10/23/2024 | Measur+Listed | |
| 6/5/2019 | Measur+Listed | EXTERIOR INSPECTION TO CONFIRM ATM AND TUBE. |
| 6/3/2010 | Electric Finish | |
| 6/1/2010 | Certificate of Occupancy | |
| 5/26/2010 | Assessor Reviewed | NOT FINISHED 2010 CK 2011 FOR FINAL |
| 3/9/2010 | Plumbing | ALL FIRE CAULKING INSTALLED, FRAMING OK EXCEPT ON BOLT ON A TIE DOWN IN THE SW CORNER OF THE BUILDING WAS MISSING. ALSO ALL EROSION AND SEDIMENTATION CONTROL WAS ORDERED REPAIRED. |
| 3/8/2010 | Plumbing | ROUGH PLUMBING IN WALLS, FIRE CAULK MISSING, WILL CHECK AGAIN 3/9/10 |
| 2/26/2010 | Changed Lot Size | THIS LOT WAS REDUCED BY 9 SQFT AS A TRIANGULAR LOT WAS GRANTED TO THE CITY OF SACO AS A CURB CUT FOR CORNER OF MAIN ST & ROSS RD. |
| 11/18/2009 | Plumbing | SUB SLAB PLUMBING |
| 11/17/2009 | Foundation | FROST WALL REBAR |
| 11/16/2009 | Foundation | PIER REBAR/DRIVE THRU |
| 11/12/2009 | Foundation | WALL REBAR/FULL FOUNDATION |
| 11/5/2009 | Foundation | THIS LOT WAS REDUCED BY 9 SQFT AS A TRIANGULAR LOT WAS GRANTED TO THE CITY OF SACO AS A CURB CUT FOR CORNER OF MAIN ST & WOODMAN AVE. |