Visit History
| 9/26/2025 | Assessor Reviewed | ADDED LEASE AGREEMENT AMENDMENT TO ASSO DOCS |
| 4/4/2019 | Measu/LtrSnt Letter Sent no response | ELCTRIC WOND GENERATOR IS GONE DR. |
| 8/1/2008 | Plumbing | |
| 3/24/2008 | Foundation | TWO PIERS BETWEEN BUILDING AND PLATFORM |
| 3/21/2008 | Foundation | COLUMN REBAR /NEAR PLATFORM |
| 3/18/2008 | Foundation | FOOTING REBAR COLUMNS NEAR PLATFORM |
| 3/18/2008 | Changed Lot Size | PER DHS, MAP 37 LOT 9 WAS JOINED TOGETHER WITH LOT 8. LOT 9 WAS INACTIVATED. |
| 3/13/2008 | Foundation | WALL REBAR EAST WALL |
| 3/11/2008 | Foundation | FOOTING REBAR EAST WALL |
| 3/6/2008 | Electric Service | SUB SLAB CONDUIT FOR PHONE & CABLE FROM FRONT OF BUILDING TO BASEMENT |
| 3/4/2008 | Foundation | REBAR IN FOOTINGS OF INTERIOR COLUMNS |
| 2/22/2008 | Plumbing | SUB SLAB/FLOOR DRAINS IN BASEMENT |
| 2/20/2008 | Foundation | FOOTING REBAR SOUTH WALL |
| 2/7/2008 | Foundation | NORTH WALL FOOTING REBAR INSPECTION |
| 1/28/2008 | Foundation | FOUNDATION OF FULL CELLAR. 37 DEGREES, SUNNY. WILL TENT AND HEAT THIS EVENING AND OVERNIGHT. DID NOT INSPECT REBAR, CONCRETE ALREADY POURED PRIOR TO MY ARRIAVAL. WILL SEND SPECIAL INSPECTION REPORT |
| 1/18/2008 | Foundation | REBAR BASEMENT WALLS |
| 1/16/2008 | Foundation | FOOTING REBAR/BASEMENT |
| 1/22/2007 | Changed Lot Size | CHANGED LOT SIZE TO 1.78 ACRES BECAUSE 3.78 ACRES WAS SPLIT OFF TO CREATE L8-1. |