Visit History
| 3/3/2025 | Assessor Reviewed | |
| 1/6/2025 | Measur+Listed | |
| 3/26/2018 | Listed NOH | |
| 11/16/2017 | Elec Rough In | |
| 11/7/2017 | Elec Rough In | OFFICE ADDITION |
| 10/5/2017 | Foundation | |
| 2/13/2009 | Complaint | FOLLOW UP TO 2-6-09 INSPECTION, ALL DEFECIENCIES CORRECTED |
| 2/6/2009 | Complaint | INSPECTED 4 UNITS AND COMMON AREAS, MINOR DEFECIENCIES NOTED. |
| 4/28/2006 | Electric Finish | FCO 2367 |
| 4/28/2006 | Final Miscellaneous | INSPECTED COMMERCIAL SPACE FOR CO. ALL DONE EXCEPT FOR COMPLETION OF SPRINKLER SYSTEM. ISSUED TEMPORARY C OF O. |
| 3/15/2006 | Framing | OK ON NON-BEARING WALLS. FOUND THE FLOOR/CEILING ASSEMBLY WAS NOT IN COMPLIANCE WITH THE ORIGINAL APPROVALS (2 HOUR RATED ASSEMBLY MISSING) CALLED ARRON BATEMAN 772-2992 TO ADVISE |