Visit History
| 2/28/2025 | Assessor Reviewed | |
| 12/18/2024 | Measur+Listed | |
| 6/5/2019 | Measur+Listed | EXTERIOR INSPECTION TO CONFIRM ATM AND TUBE. |
| 4/6/2007 | Electric Service | |
| 3/30/2007 | Plumbing | |
| 3/12/2007 | Framing | FRAMING OK EXCEPT FOR TRUSSES. NEED CERTIFICATION FROM MANUFACTURER OR DESIGNER DUE TO MISSING BRACING WHICH CANNOT BE INSTALLED |
| 2/9/2007 | Changed Lot Size | LOTS 161 AND 164 HAVE BEEN ADDED TO THIS PROPERTY TO MAKE ONE PARCEL OF LOT 162. |
| 1/4/2007 | Elec Rough In | SIGN CONDUIT |
| 1/2/2007 | Plumbing | SUB SLAB |
| 12/28/2006 | Electric Service | UNDERGROUND CONDUIT INSPECTION. 4" FOR SECONDARY, 4" FOR VOICE/DATA, 4" SPARE. FROM POLE TO MECHANICAL ROOM. 400 AMP SERVICE. |
| 12/20/2006 | Foundation | INSPECTED REBAR IN FOUNDATION WORK. SURVEYOR TO CHECK LOCATION LATER THIS MORNING BEFORE CONCRETE POUR |
| 12/19/2006 | Electric Service | |
| 3/13/2006 | Assessor Reviewed | PER PLANNING BOARD ALL ONE LOT |