| 6/5/2025 | No Trespassing/Gated | |
| 2/15/2019 | FINAL | |
| 11/30/2018 | Elec Rough In | |
| 11/19/2018 | PLUMBING ROUGH IN | |
| 11/19/2018 | Framing | |
| 9/30/2010 | Final Miscellaneous | ROOF ALTERATION |
| 9/17/2010 | Framing | FRAMING ON NEWLY REBUILT NORTH SIDE ROOF |
| 4/12/2010 | Framing | SECOND INSPECTION ON NEW EXTERIOR CHIMNEY. CLEARANCE OF CLEANOUT DOOR TO GRADE IS APPROX. 2 INCHES, 16 INCHES MIN. REQUIRED, FAILED INSPECTION. |
| 4/8/2010 | Foundation | FOUNDATION FOR NEW EXTERIOR CHIMNEY. SPOKE TO BUILDER ON PHONE TO QUESTION HOW THE CLEANOUT DOOR WOULD BE INSTALLED, SAID IT WOULD BE OUTSIDE BELOW THE CONNECTOR PIPE. DID NOT KNOW THAT THERE WOULD BE ENOUGH CLEARANCE TO GRADE |
| 6/6/2008 | Listed NOH | |
| 7/17/2005 | Listed NOH | |
| 4/15/2003 | Listed NOH | |
| 11/4/2002 | Listed NOH | |