Visit History
| 2/28/2025 | Assessor Reviewed | |
| 10/24/2024 | Measur+1Visit | |
| 6/28/2023 | Measur+Listed | REV PROP FOR UC CHECK- REWORKED SKETCHES FOR CABINS USING NEARMAP 2023 AND PREVIOUS BUILD PERMITS/CO'S- APPEARS ALL 12 CABINS HAVE RECEVIED CO'S- SKETCHES 14-16 DELETED DUE TO BEING DUPLICATES |
| 7/22/2019 | Measur+Listed | NO CHANGE AND THE REMAINING CABINS HAVE NOT BEEN STARTED YET. |
| 1/31/2018 | Listed | REMOVED OB CAB2 AND CREATED IDIVIDUAL BUILDING CARDS, CABIN 1,2,3 12X18 BUILT 2013, CABIN 4,5,6,7,8,9, BUILT 2017 16X20, CABIN 10,11,12 FOUNDATION ONLY = UC = 16% |
| 9/25/2017 | Listed NOH | CO INSPECTION OF CABINS |
| 7/6/2017 | FINAL | CABINS 7,8 & 9 |
| 6/28/2017 | FINAL | CABINS 4,5,&6 |
| 5/25/2017 | INSULATION INSPECTION | BACK THREE CABINS |
| 5/22/2017 | INSULATION INSPECTION | MIDDLE THREE CABINS |
| 5/19/2017 | PLUMBING ROUGH IN | BACK THREE CABINS |
| 5/19/2017 | Elec Rough In | BACK THREE CABINS |
| 5/19/2017 | Framing | BACK THREE CABINS |
| 5/17/2017 | Framing | MIDDLE THREE CABINS |
| 5/17/2017 | PLUMBING ROUGH IN | MIDDLE THREE CABINS |
| 5/17/2017 | Elec Rough In | MIDDLE THREE CABINS |
| 3/31/2017 | Listed NOH | FOUNDATIONS FOR FUTURE CABINS |
| 6/19/2014 | Listed | 3 NEW TRANSIENT CABINS |
| 7/5/2013 | FINAL | 3 CABINS |
| 6/18/2013 | INSULATION INSPECTION | 3 CABINS |
| 6/12/2013 | PLUMBING ROUGH IN | 3 CABINS |
| 6/12/2013 | Framing | 3 CABINS |
| 5/23/2013 | Foundation | SLABS 3 CABINS |
| 5/22/2013 | PLUMBING SUB SLAB | 3 CABINS |
| 11/6/2012 | Changed Lot Size | ADDED .57 ACRES OF LAND TO THIS LOT AS IT WAS GRANTED BY ABUTTER. |
| 6/3/2010 | Relisted | |