Visit History
| 3/3/2025 | Assessor Reviewed | |
| 11/7/2024 | Measur+Listed | |
| 4/17/2012 | FOLLOW UP FCO | PROGRESS CHECK ON SITE WORK AND BUILDING CONSTRUCTION |
| 2/7/2012 | Framing | NEW BATHROOM BUILDING, COULD NOT VIEW ROOF FRAMING DUE TO PLASTIC SHEETING |
| 1/12/2012 | Changed Lot Size | CEMETARY LOT LAND ADDED BACK TO THIS LOT AS THE CEMETARY (BURIAL SITE) WAS MOVED TO LAUREL HILL CEMETARY. 2450 SQFT WAS CONVEYED BACK TO CORMIER. |
| 1/5/2012 | PLUMBING SUB SLAB | NEW RESTROOM BUILDING |
| 12/28/2011 | Foundation | FOOTING INSPECTION FOR NEW BATHROOM BUILDING |
| 12/21/2011 | PLUMBING ROUGH IN | HUNGRY BEAR CONCESSION ABOVE GRADE PLUMBING |
| 12/1/2011 | PLUMBING SUB SLAB | INSPECTED 3000 GALLON GREASE TRAP ON NORTHEAST SIDE (OUTSIDE) OF NEW FOOD CONCESSION BUILDING |
| 11/28/2011 | Framing | PUMP HOUSE |
| 11/28/2011 | PLUMBING SUB SLAB | SUB SLAB PLUMBING OF CONCESSION BUILDING |
| 11/8/2011 | Foundation | SLIDE SUPPORT FOOTING INSPECTION |
| 10/20/2011 | Foundation | FOOTING FOR SLIDE |
| 2/28/2011 | Changed Lot Size | REDUCED LOT SIZE BY .056 ACRES OR 2450.25 SQFT REGARDING THE PHILLIPS CEMETERY WHICH IS BEING MAPPED AS A SEPERATE PARCEL BEING 044-003-001-000. |
| 6/8/2007 | Electric Finish | |
| 6/6/2007 | Final Miscellaneous | WATER SLIDE AND TORNADO ATTRACTION. ALSO PUMP HOUSE FINAL |
| 11/7/2006 | Foundation | FOUNDATION F3 AND REBAR FOR COLUMN PC4; FOUNDATION ALREADY POURED FOR F6, F9F14, F10 WITH REBAR FOR COLS. TC3, TL1, TC2, PT1 (8A & 8B)TC1,. COLUMN PT1-14 DIFFERED FROM DESIGN WHERE IT HAD 22 # 6 (PLAN CALLES FOR 12 # 8'S) |
| 11/4/2006 | Foundation | COLUMNS PC 7, PC 8 AND PC 9 POURED |
| 10/31/2006 | Foundation | INSPECTED FOOTING F5 AND F13 AND REBAR IN COLUMNS MR2 24 A & B AND PT2 26 A 7& B |
| 10/25/2006 | Foundation | INSPECTED FOUNDATION F11(MR2 16 A & B) AND F10 (MR2 13 A & B) |
| 10/24/2006 | Foundation | FOOTING F4 AND REBAR FOR COLUMNS MR2 10 A & B AND 13 A & B DONE. FOOTING F11, COLUMNS 16 A & B, 19 A & B AND 22 A & B DONE |
| 10/18/2006 | Foundation | INSPECTED FOOTING F5 AND REBAR FOR COLUMN PC7 |
| 10/17/2006 | Foundation | FOUNDATION F3 AND REBAR FOR COLUMN PC4; FOUNDATION ALREADY POURED FOR F6, F9F14, F10 WITH REBAR FOR COLS. TC3, TL1, TC2, PT1 (8A & 8B)TC1,. COLUMN PT1-14 DIFFERED FROM DESIGN WHERE IT HAD 22 # 6 (PLAN CALLES FOR 12 # 8'S) |