Visit History
| 11/6/2024 | Measur+Listed | |
| 8/27/2021 | Card Prepped | UC FOR RENOVATION. |
| 5/9/2015 | No change | INTERIOR WALLS FOR OFFICE = NV. |
| 12/24/2014 | Elec Rough In | OFFICE WALLS |
| 12/19/2014 | Framing | OFFICE WALLS |
| 6/3/2010 | Relisted | |
| 1/30/2009 | Changed Lot Size | REDUCED LOT SIZE BY 4.38 ACRES PER DEED BK 15516 PAGE 510 WHICH CONVEYS LAND TO LOT 4-1. |
| 1/5/2009 | Electric Service | TRENCH FOR SIGN |
| 4/22/2008 | Plumbing | FINAL PLUMBING/CARWASH |
| 2/4/2008 | Plumbing | UNDER LAVATORY HOOK-UP ( BEFORE SHEILD INSTALLATION) |
| 1/31/2008 | Plumbing | SUB SLAB /CARWASH |
| 1/10/2008 | Foundation | FOUNDATION BEFORE BACKFILL/REAR CARWASH |
| 1/9/2008 | Foundation | FOUNDATION REBAR INTERIOR WALLS/REAR CARWASH |
| 1/8/2008 | Foundation | FOUNDATION REBAR PERIMETER WALL /REAR CARWASH |
| 1/7/2008 | Foundation | FOOTING REBAR/REAR CARWASH |
| 10/24/2007 | Elec Rough In | PARKING LOT UNDER GROUND FOR LIGHTS |
| 10/23/2007 | Elec Rough In | PARTIAL WALLS |
| 10/18/2007 | Plumbing | SUB SLAB CONNECTION TO OUTSIDE AT SERVICE BAY |
| 10/9/2007 | Plumbing | INSPECTED LINE FOR TRENCH DRAIN FOR CAR WASH INSIDE SERVICE AREA |
| 10/3/2007 | Elec Rough In | UNDERSLAB WIRING |
| 9/20/2007 | Plumbing | UNDER SLAB PLUMBING INSPECTION OF REPAIR BAY NOT INCLUDING TRENCH DRAIN |
| 8/29/2007 | Foundation | FOUNDATION INSPECTION OF SERVICE BAYS, NORTH AND WEST WALLS |
| 8/17/2007 | Plumbing | UNDER SLAB PLUMBING OF ALL DRAIN LINES IN FRONT HALF OF BUILDING, NOT INCLUDING SERVICE AREA |
| 8/15/2007 | Foundation | WEST (FRONT) WALL COMPLETE AND NORTH WALL TO SERVICE BAYS |
| 8/8/2007 | Foundation | INTERIOR COLUMN PEIRS AND EAST WALL FOUNDATION (SHOWROOM/OFFICE AREA) |
| 7/25/2007 | Foundation | FOOTING INSPECTION RIGHT REAR OF SHOWROOM |
| 7/18/2007 | Foundation | FOOTING INSPECTION RIGHT WALL LINE SHOWROOM, FOUNDATION WALL FRONT SHOWROOM SIDE |
| 7/17/2007 | Foundation | FOOTING INSPECTION, FRONT SIDE PARALELL TO PORTLAND RD |
| 6/5/2007 | Electric Service | TEMP SERVICE FAILED |