Visit History
| 5/20/2025 | Measur+1Visit | |
| 4/8/2024 | Measur+Listed | OWNER CAME IN AND INFORMED THAT BASEMENT WAS NOW FULLY FINISHED. WORK ADDED 1 FULL BATHROOM. CHANGED BASEMENT TO FULL FBM AND ADDED BATHROOM. |
| 2/16/2023 | Measur+Listed | ENTER BP 10508- REV PROP VIA NEARMAP AND REALTOR LISTING FROM 2022- ADJUSTED: ADDED 2 SKYLIGHTS, ADD 594-SQFT SFB, 4 BED TOTAL, ADDED NEW PICS AND ASSOC DOCS. |
| 6/4/2008 | Listed NOH | |
| 4/22/2006 | Listed | CK PLANS - LEFT CARD |
| 1/11/2006 | Framing | CEILING JOISTS AND HEADER IN SECOND FLOOR AREA REQUIRED STEEL HANGARS |
| 1/11/2006 | Elec Rough In | |
| 7/28/2003 | Listed NOH | |
| 11/14/2002 | Listed NOH | |
| 1/29/2002 | Measur+Listed | |