Visit History
| 10/31/2024 | Measur+Listed | |
| 4/1/2020 | Measur+Listed | |
| 3/13/2020 | Measur+Listed | ADDED THIRD BUIDLING AND PUT AT UC. |
| 2/28/2020 | INSULATION INSPECTION | First floor |
| 1/16/2020 | Framing | |
| 1/13/2020 | Measur+Listed | NEW STRUCTURE IS 50%. |
| 1/6/2020 | Measur+Listed | UC FOR NEW STRUCTURE. |
| 11/27/2019 | Measur+Listed | VERIFY SHED. |
| 11/25/2019 | PLUMBING SUB SLAB | |
| 6/18/2016 | Listed NOH | ADDED HOME DAYCARE BLDG CARD 2; CARD 1 HAS NEW SIDING, ROOF, WINDOWS & DOORS; GARAGE HAS NEW SIDING, WINDOW & ROOF. |
| 2/18/2016 | FINAL | |
| 2/2/2016 | Electric Service | |
| 1/11/2016 | INSULATION INSPECTION | |
| 1/6/2016 | PLUMBING ROUGH IN | |
| 1/4/2016 | Framing | |
| 1/4/2016 | Elec Rough In | |
| 11/16/2015 | PLUMBING SUB SLAB | |
| 11/2/2015 | Foundation | |
| 4/12/2010 | Assessor Reviewed | TOOK NEW PHOTO DID NOT COME OUT |
| 7/9/2007 | Listed NOH | SAME COND |
| 8/15/2006 | Electric Finish | |
| 3/28/2003 | Listed NOH | |