Visit History
| 7/25/2025 | HEARING CHANGE | |
| 11/21/2024 | Measur+1Visit | |
| 7/17/2019 | Assessor Reviewed | CHANGE OF MAILING ADDRESS FILED BY EMAIL TO TAX COLLECTOR |
| 1/28/2019 | FINAL | Gym Nation |
| 8/16/2018 | Framing | detached rear building |
| 12/4/2017 | Listed | CO FOR EATING ESTABLISHMENT |
| 9/25/2017 | Listed | TENANT FITOUT - CO FOR CONVERSION OF ICE RINK TO MULTI USE |
| 3/8/2017 | Measur+1Visit | |
| 3/29/2016 | PLUMBING ROUGH IN | |
| 3/12/2016 | Listed | BP #2016 - 005 = TURF AREA & ADDING WALL TO SALT SHED. BP #2015-476 = SNACK BAR NOT FINISHED - SEE 2017 |
| 3/1/2016 | Framing | |
| 1/29/2016 | PLUMBING SUB SLAB | |
| 9/6/2013 | Assessor Reviewed | INSPECTED PROPERTY WITH CEO. ICE RINK AREA (ONE SIDE OF BUILIDNG) WAS EXTENDED 7 FEET IN ORDER TO MAKE AN NHL REGULATION SIZE RINK. ALSO AN ADDITIONAL STORAGE ROOM, OFFICE AND LOCKER ROOM FOR THE PORTLAND PIRATES WAS ADDED. |
| 9/6/2013 | FINAL | LOCKER ROOM & RINK RENOVATION |
| 8/13/2013 | PLUMBING ROUGH IN | |
| 5/10/2013 | Foundation | FOOTING ICE RINK EXPANSION |
| 1/31/2013 | PLUMBING SUB SLAB | SWIM CENTER |
| 9/29/2011 | FINAL | TEMPORARY CERTIFICATE OF OCCUPANCY ISSUED |
| 8/16/2011 | Complete Rough In | |
| 7/18/2011 | INSULATION INSPECTION | FOUNDATION INSULATION |
| 7/15/2011 | Foundation | FOUNDATION REBAR, DEVIATES FROM APPROVED PLAN, TOLD TO GET OK FROM ARCHITECT |
| 7/14/2011 | Foundation | FOOTING REBAR |
| 1/22/2009 | Final Miscellaneous | FINAL INSPECTION ON OA CLINICAL AREA. PASSED WITH MINOR CHANGES NEEDED (HORN-STROBE AND EMERGENCY LIGHTS IN BATHROOM/SHOWERROOM NEEDS TO BE MOVED UP DUE TO LOCKER PLACEMENT) |
| 11/5/2008 | Plumbing | ROUGH INSPECTION OF LARGE MENS AND LADIES RESTROOMS IN OA SECTION |
| 9/15/2008 | Plumbing | |
| 9/3/2008 | Plumbing | |
| 7/2/2008 | Plumbing | SUB SLAB |
| 6/30/2008 | Plumbing | SUB SLAB |
| 6/25/2008 | Plumbing | SUB SLAB |
| 6/18/2008 | Plumbing | SUB SLAB |
| 5/9/2008 | Final Miscellaneous | CHECKED CONSTRUCTION OF REAR EXTERIOR STAIRS AGAINST PLAN SUBMITTED BY LEON B. MURRAY, PE. ALSO DID INTERIOR INSPECTION OF REAR MEZZANINE. CONSTRUCTION IS COMPLIANT BUT THERE IS SOME MINOR ELECTRICAL WORK TO BE FINISHED |
| 1/3/2008 | Final Miscellaneous | REQUESTED INSPECTION TO BRING OCCUPANCY LEVEL TO 250-500. GAVE A PUNCH LIST TO GENERAL CONTRACTOR AND EXPLAINED TOO MANY ISSUES TO ALLOW OCCUPANCY LEVEL TO INCREASE. TEMP. OCC. STAYS IN PLACE WITH 50 MAX |
| 12/17/2007 | Final Miscellaneous | A PARTIAL TEMPORY CO WITH CONDITIONS OK'ED |
| 12/17/2007 | Plumbing | PUMP STATION |
| 12/5/2007 | Plumbing | VENTING ICE ARENA AREA |
| 11/2/2007 | Plumbing | ICE ARENA AREA |
| 10/23/2007 | Plumbing | SUB SLAB ICE ARENA AREA |
| 9/8/2005 | Hearings | MR COHEN WILL CALL DAN @ 9:00 AM |
| 8/25/2004 | Hearings | 8-25-04 HEARING (PHONE APPT) N/C |