Visit History
| 3/3/2025 | Assessor Reviewed | |
| 11/19/2024 | Measur+Listed | |
| 7/27/2023 | Measur/New UC Under Construction | NEW COM CONST- BUILT UP AND SET UC @35% FOR 2023- ADJUSTED LL 3400 TO 221,208-SQFT TO INCORPORATE SECOND BUILDING AND DEVELOPED LAND- REDUCED LL3920 TO 70,280-SQFT- ADDED 26150-SQFT PAVING AND 13,350-SQFT BAS, BOTH AT 35% UNTIL CO-ADDED PICS |
| 7/25/2023 | Assessor Reviewed | DROPPED THE GRADE ON THE EXISTING BUILDING TO AVE+10, AS WARRENTED. 2ND BLDG ON LOT IS 35% DONE ON 4/1/2023. |
| 7/1/2020 | FINAL | |
| 6/7/2007 | Measur+Listed | |
| 7/8/2003 | Listed | |