Visit History
| 1/29/2025 | Measur+1Visit | |
| 8/30/2024 | Inspection Assessing | INTERIOR REMODEL OF FIRST FLOOR. COMPLETE REWIRE/REPLUMB OF BUILDING. UPSTAIRS UNIT MOSTLY THE SAME. CHANGED FLOOR TO LAMINATE, ADDED HEAT PUMP, CHANGED BEDROOM COUNT TO 4, UPDATED KITCHEN AND BATH STYLE TO AVERAGE, CHANGED DEPRECIATION TO G, REMOVED SHED |
| 6/21/2022 | Changed Lot Size | REDUCED THIS LOT SIZE TO .83 ACRES AS SET OUT IN DEED OF DISTRIBUTION |
| 4/28/2007 | Listed NOH | CURRENT INFO |
| 8/22/2002 | Listed | |