Visit History
| 1/31/2025 | Total Refusal | REFUSAL |
| 11/14/2017 | Assessor Reviewed | MLS LISTING SEE ASSOCIATED DOCS |
| 8/5/2013 | FINAL | DETATCHED GARAGE |
| 6/26/2013 | INSULATION INSPECTION | |
| 6/25/2013 | Elec Rough In | DETACHED GARAGE |
| 6/5/2013 | Framing | DETACHED GARAGE |
| 5/5/2012 | Measur+Listed | SPOKE W/DAD. RAISE ROOF & ADDED 2ND BATH. MUCH WORK BEING DONE. |
| 9/28/2011 | FINAL | |
| 4/6/2011 | INSULATION INSPECTION | |
| 3/21/2011 | FOLLOW UP FCO | ROUGH IN PLUMBING, TEST ON, ALL SET |
| 3/18/2011 | PLUMBING ROUGH IN | DID NOT PASS, NO TEST ON PLUMBING, ADVISED PLUMBER BY PHONE |
| 3/16/2011 | Framing | ROOF ALTERATIONS FRAMING |
| 8/26/2010 | Changed Lot Size | CORRECTED LOT SIZE PER CURRENT DEED DESCRIPTION. |
| 11/2/2009 | Electric Service | NEW PANEL |
| 10/29/2009 | Framing | 1ST FLOOR REMODEL |
| 10/29/2009 | Elec Rough In | 1ST FLOOR REMODEL |
| 4/13/2007 | Listed NOH | CURRENT INFO |
| 8/23/2002 | Listed NOH | . |