Visit History
| 6/19/2025 | Total Refusal | |
| 6/18/2025 | Inspect At Owners Request | OWNER REQUESTED INSPECTION IN STEAD OF VISION. ADDED DBL SINK, CHANGED FLOOR 1 FROM AVERAGE TO HARDWOOD AND FLOOR 2 TO CERAMIC TILE. CHANGED HEAT FUEL FROM OIL TO GAS. CHANGED HEAT TYPE FROM HOT WATER TO FORCED AIR DUCT. ADDED SEPTIC AS UTILITY. |
| 12/16/2019 | Measur+Listed | VERIFY PORCH IS THERE. |
| 11/19/2009 | Changed Lot Size | PER DHS, ADVISED TO ADD 3750 SQFT TO LOT AS PER DEED BK/PG: 15729/506. THIS DEED LAYS CLAIM TO THE CENTER LINE OF PRIVATE RIGHT OF WAY FOR THIS LOT. |
| 11/17/2009 | Listed NOH | NO NEED TO GET IN |
| 9/17/2009 | Final Miscellaneous | CO ISSUED |
| 8/10/2009 | Electric Service | |
| 7/30/2009 | Plumbing | |
| 7/30/2009 | Elec Rough In | |
| 7/30/2009 | Framing | |
| 6/24/2009 | Foundation | |
| 7/1/2007 | Listed NOH | FAILING COND |
| 8/19/2004 | Hearings | 8-19-04 HEARING N/C |
| 10/10/2003 | Change Reinspection Rereview | |
| 5/2/2003 | Listed NOH | |