Visit History
| 8/13/2025 | Measur/Inf/Dr Info taken at door. | |
| 6/27/2019 | Electric Service | Generator, flex |
| 3/26/2019 | Measu/LtrSnt Letter Sent no response | |
| 12/21/2018 | FINAL | |
| 11/9/2018 | TOP OF PIPE | |
| 11/9/2018 | SUB GRADE | |
| 10/31/2018 | Electric Service | |
| 10/5/2018 | INSULATION INSPECTION | |
| 10/1/2018 | PLUMBING ROUGH IN | |
| 10/1/2018 | Elec Rough In | |
| 10/1/2018 | Framing | |
| 8/23/2018 | Changed Mailing Address | |
| 7/23/2018 | PLUMBING SUB SLAB | |
| 7/5/2018 | Foundation | |
| 11/14/2007 | Measur+1Visit | REMOVED SHED OFF THE LOT. |
| 6/19/2003 | Listed NOH | |