Visit History
| 1/21/2025 | Measur/Inf/Dr Info taken at door. | |
| 1/22/2020 | Inspect At Owners Request | VERIFIED DIMENSIONS AND ADJUSTED SKETCH AND CHANGED PART OF THE BASEMENT FROM FBM TO UBM. ADDED HEAT PUMP. |
| 1/18/2016 | Listed | UGR TO FGR |
| 11/18/2008 | Changed Lot Size | PER SUB DIV |
| 4/13/2007 | Listed NOH | CURRENT INFO |
| 4/8/2006 | Measur+Listed | ABV GARAGE = BEDROOM - HW FLOORS |
| 6/23/2005 | Listed | |
| 8/19/2002 | Listed | |