Visit History
| 8/12/2025 | Measur+Listed | |
| 8/12/2025 | Measur+1Visit | |
| 6/5/2023 | Measur+Listed | REV PROP VIA NEARMAP 2023- BP 2022-328 STILL IN PROGRESS- ADDED 4X6 FOP AND 250-SQFT WDK- REDUCED 14X18 BAS/UBM TO 10X18 |
| 1/5/2022 | Assessor Reviewed | ABATEMENT DONE FOR 2 YEARS FOR $65,300 IN 'OUTBUILDING' ASSESSMENTS IN ERROR/THESE OUTBUILDINGS WENT WITH THE SPLIT DONE IN 2020. |
| 1/5/2022 | Assessor Reviewed | CHANGED 2ND FLOOR TO UQS AS THERE ARE 2 DORMERS IN THE FRONT AND A LARGE ONE IN THE BACK. |
| 9/4/2020 | Card Prepped | CHANGED LAND LINE TO ONE FAMILY AND REMOVED VACANT LAND CONDITION FACTOR TO BE IN LINE WITH NEIGHBORHOOD |
| 11/5/2019 | FINAL | |
| 8/26/2019 | Framing | |
| 8/26/2019 | INSULATION INSPECTION | |
| 8/23/2019 | Elec Rough In | |
| 8/21/2019 | Assessor Reviewed | 5 COPPINGER CT WHICH WAS BUILDING ONLY (NO LAND) WAS MOVED TO 4 COPPINGER CT AND IS NOW LISTED AS 'MULTIHOUSES' UNTIL SUCH TIME AS THERE IS A DEED TO SEPARATE THE TWO HOUSES. 5 COPPINGER CT HAS BEEN RENDERED 'INACTIVE'. |
| 6/13/2015 | Listed | GARAGE IN-PROCESS - NO WINDOWS, SIDING, FLOOR, DOOR; M/BATH = PART ROCK - NO FIXTURES; 14 X 18 ADDN = NO FLOORING; ADDED UBM'S; CHG'D UUS TO UHS; ALSO EBB & PELLET STOVE. PER OWNER 2ND FLR NEVER TO BE FINISHED. - GRADE? NO INTERIOR INSP. CK GAR SIZE |
| 11/13/2014 | Foundation | |
| 9/30/2014 | TOP OF PIPE | 2ND UNIT |
| 8/29/2014 | SUB GRADE | 2ND UNIT |
| 6/17/2014 | INSULATION INSPECTION | 2ND UNIT |
| 4/29/2014 | PLUMBING ROUGH IN | 2ND UNIT |
| 3/31/2014 | Framing | 2ND UNIT GARAGE WITH ROOMS ABOVE |
| 2/19/2014 | Measur+Listed | ONLY 1ST FLOOR WILL BE COMPLETED BY 4-1-2014. BASEMENT AND 2ND FLOOR NOT FINISHED. |
| 2/19/2014 | Changed Lot Size | UPDATED LOT SIZE |
| 2/19/2014 | Measur+Listed | 2ND FL IS NOT FINISHED AS OF TODAYS DATE. GARAGE NOT YET BUILT. |
| 2/18/2014 | FINAL | SIX MONTH TEMPORARY CO |
| 11/5/2013 | TOP OF PIPE | |
| 10/23/2013 | SUB GRADE | |
| 9/23/2013 | Framing | |
| 8/20/2013 | Electric Service | |
| 10/23/2012 | Changed Street Number | ONLY 1ST FLOOR WILL BE COMPLETED BY 4-1-2014. BASEMENT AND 2ND FLOOR NOT FINISHED. ASSESSING FOR 4-1-2014 AS 60% COMPLETED, UNDER CONSTRUCTION. |