Visit History
| 8/19/2025 | Measur/Inf/Dr Info taken at door. | |
| 8/19/2025 | Measur+1Visit | |
| 2/9/2023 | Measur+Listed | CLOSED BP FOR SOLAR PANELS- ADDED 27 SOLAR PANELS TO EXTRA FEATURES |
| 3/10/2017 | Changed Mailing Address | |
| 3/14/2015 | Listed NOH | LEFT DT - EST BSMT FINISH TO BE DONE; UGR TO FGR. |
| 8/1/2014 | FINAL | BASEMENT |
| 6/23/2014 | Elec Rough In | BASEMENT |
| 6/23/2014 | Framing | BASEMENT |
| 3/30/2012 | Assessor Reviewed | AREA ABOVE GAR IS ALL HEATED WITH DRY WALL NO FLOOR COVER AND NO ACCESS FROM MAIN HOUSE , -2% FOR FUNCT, ACCESS TO ABOVE GAR FROM 2ND FLOOR WOULD REQUIRE MOVING WASHER AND DRYER INTO GAR AREA. |
| 5/14/2003 | Listed NOH | |