Visit History
| 9/10/2025 | Measur/Inf/Dr Info taken at door. | |
| 4/10/2020 | FINAL | |
| 4/1/2020 | Measur+Listed | |
| 3/4/2020 | Measur+Listed | BUILT UP. UC. |
| 1/27/2020 | INSULATION INSPECTION | |
| 1/16/2020 | Elec Rough In | |
| 1/16/2020 | PLUMBING ROUGH IN | |
| 1/16/2020 | Framing | |
| 11/8/2019 | TOP OF PIPE | |
| 11/6/2019 | SUB GRADE | |
| 10/30/2019 | Foundation | |
| 10/25/2019 | SUB GRADE | Posted "Not Approved" on bottom of bed |
| 10/24/2019 | SUB GRADE | |
| 12/18/2017 | Changed Lot Size | CHANGED LOT SIZE PER PLAN_SPLIT OFF 14.7 ACRES TO DONNA TRIPP |
| 5/1/2017 | Changed Lot Size | SOLD OFF 1.7 ACRES |
| 5/1/2017 | Changed Lot Size | SOLD OFF .988 ACRES CREATING LOT 4 ON SURVEY PLAN |
| 6/26/2008 | Listed NOH | |
| 7/10/2003 | Listed | |