Visit History
| 9/9/2025 | Measure - Info Card left | 4:19 |
| 9/9/2025 | Measur+1Visit | |
| 3/31/2025 | Inspection Assessing | CLOSED BP#12062 AND ADJUSTED SKETCH TO FIT ADDITION. |
| 3/30/2023 | Measur/New UC Under Construction | |
| 12/19/2022 | Measur/New UC Under Construction | NEW SF CONSTRUCTION- ENTER BP 2022-449- BUILT UP AND SET UC AT 5%- LANDLINE 101V TO 1010- CONDITION FACTOR FROM .9 TO 1.0 -BUILD PLAN PIC IN ASSOC DOCS |