Visit History
| 9/25/2025 | Measur/Int Refusal No information give | |
| 3/31/2023 | Measur/New UC Under Construction | AS OF 3/31/23- WORSKSHOP IS 50% COMPLETED- SET AT 50% GOOD- SEE ASSOC DOCS FOR BP STATUS LETTER |
| 2/19/2021 | Measur+Listed | UC FOR FINISHED BASEMENT. |
| 10/9/2019 | TOP OF PIPE | |
| 2/5/2019 | Listed NOH | |
| 6/4/2018 | Changed Lot Size | REDUCED THIS LOT BY 1.84 ACRES_TO CREATE 124-004-003-001 |
| 3/21/2018 | Measur+Listed | |
| 2/8/2018 | FINAL | |
| 11/16/2017 | INSULATION INSPECTION | |
| 11/8/2017 | Framing | |
| 11/8/2017 | Elec Rough In | |
| 11/8/2017 | PLUMBING ROUGH IN | |
| 10/6/2017 | TOP OF PIPE | |
| 10/4/2017 | PLUMBING SUB SLAB | |
| 10/2/2017 | Foundation | |