| 1/29/2025 | Measur+1Visit | |
| 1/17/2015 | Assessor Reviewed | |
| 1/9/2007 | Measur+1Visit | LEFT HANGER FOR INSPECTION |
| 12/26/2006 | Listed NOH | CURRENT DATA |
| 8/4/2006 | Electric Finish | |
| 3/24/2006 | Listed | |
| 2/14/2006 | Elec Rough In | |
| 2/14/2006 | Plumbing | |
| 2/6/2006 | Framing | |
| 2/2/2006 | Electric Service | |
| 1/10/2006 | Septic System Inspection | 20 ELGIN IN-DRAINS INSTALLED AS WELL AS SEPTIC TANK AND PIPE DISTRIBUTION SYSTEM. ALL ELEVATIONS CORRECT |
| 1/4/2006 | Septic System Inspection | BOTTOM OF BED INSPECTION. 12 INCHES LOWER THAN BOTTOM OF SYSTEM NOTED. CONTRACTOR (LABBE) ADVISES THATHE WENT TO ORIGINAL GRADE AS THERE WAS FILL ON THAT PART OF THE LOT PRIOR TO THE INSTALLATIOIN CHECKEDSANDFILLCLEANBUT SOMEWHAT LESS THAN COARSE |
| 12/28/2005 | Plumbing | SUB SLAB |
| 12/20/2005 | Plumbing | SUB SLAB MAIN LINES ONLY |
| 11/29/2005 | Complaint | DELIVERED STOP WORK ORDER |
| 11/28/2005 | Foundation | |